Free · Made for Nepal · Runs in your browser

Design your own solar system - from panel to battery to switch-on.

Answer a few plain questions about your home or project. You get a complete report: what to buy, which parts are compulsory in Nepal, how every wire connects, step-by-step installation, tests, and the cost.

27 Nepal cities with real PVGIS sunshine dataNEPQA-2025 rules built in Every equation shown in the reportNo sign-up, nothing leaves your computer

Two tools, one goal: a system you can install and trust

Choose the one that fits. Both ask only what you can answer and explain how to find each number.

🏠

Home solar

Grid-tied, hybrid with battery backup for load-shedding, or fully off-grid.

  • Sizes panels, battery, inverter and MPPT from your NEA bill or appliance list
  • Month-by-month energy and your NEA bill with solar
  • Panel strings, battery bank, system and earthing drawings
  • Shopping list marked compulsory / optional in Nepal

Open Home solar →

🏭

Solar farm

Feasibility and construction package for 100 kW to 50 MW plants.

  • Energy (PVGIS + P90), row spacing, land and layout
  • String/inverter matching for cold mornings
  • BOQ, cable schedule, 11 kV connection, construction steps
  • Itemised cost estimate with low/central/high range

Open Solar farm →

📘

Component guide

Every part in plain language: panels, inverters, MPPT vs PWM, batteries, cables, MC4, protection, earthing, monitoring - with Nepal prices and what is compulsory.

Read the guide →

How it works

Three minutes of questions, then a report you can follow.

Tell it about your site

Nearest city (or exact map point), roof type, and what you want: lower bill, backup, or off-grid.

Tell it what you use

Units from your NEA bill, or pick your appliances. Hints under every box say how to measure it.

Get your report

Sizes, drawings, shopping list, cable sizes, installation steps, tests and money - on screen and as a PDF.

Buy, install, test

Check equipment against the NEPQA list, wire it as drawn, run the tests, and apply to NEA before connecting.

Worked examples

Real outputs of this app with real PVGIS data - the same thing you get for your own project.

Small off-grid home in Jumla (Karnali) - no NEA line

A family with no grid connection wants lights, a TV, phone charging, a laptop and Wi-Fi, and power for 2 days without sun. Jumla is cold (record low about −15 °C), so the battery lives indoors.

What they use

  • 6 × LED bulb (10 W) for 5 h a day
  • 1 × LED TV (32-43 inch) (60 W) for 4 h a day
  • 2 × Mobile phone charger (10 W) for 3 h a day
  • 1 × Laptop (60 W) for 3 h a day
  • 1 × Wi-Fi router (10 W) for 8 h a day

Total about 860 Wh a day (≈ 26 units a month).

What the app designed

  • 1 × 550 W panel on a metal frame tilted 29° facing south
  • MPPT charge controller (NEPQA-2025 allows PWM only below 20 A; MPPT harvests more in the cold)
  • LiFePO4 battery 24 V, about 89 Ah (2.1 kWh) with BMS - kept indoors above 5 °C
  • Pure-sine inverter of at least 280 W continuous (the smallest common size, 500 VA-1 kVA, is fine)
  • Fuse at the battery, DC isolator, DC surge protector, AC breaker + 30 mA RCD, 2 earth pits
550 W
panels
2.1 kWh
LiFePO4 battery
24 V
battery voltage
Rs 118,904
indicative cost (get quotes)

Detailed wiring

  1. Panel → controller: the panel's MC4 leads go on 1 string of solar cable (4 mm² H1Z2Z2-K, red +, black −) down to a DC isolator and a DC surge protector, then into the MPPT controller's PV terminals. Cover the panel while wiring - it is live in daylight.
  2. Battery first: connect the controller's battery terminals to the battery through the battery fuse (fuse within 30 cm of the battery +) and isolator. Always connect the battery to the controller before the panel, and disconnect the panel first.
  3. Battery → inverter: short, thick cables (size in the cable table) from the same battery bus, through the fuse/isolator.
  4. Inverter → house: inverter AC output → AC breaker → 30 mA RCD → the house circuits (brown live, blue neutral, green-yellow earth).
  5. Earthing: panel frame, mounting frame, controller and inverter cases → earth bar → two earth pits (≤ 10 Ω, AEPC spec).
Your panels: how to connect them
How to connect your panelsEach string: 1 panel(s) in SERIES (+ of one panel to - of the next): voltages add, 1 x 41.6 V = 42 V working (up to 54 V on a cold morning).Current stays the same through a string: about 14.0 A maximum (Isc).Panel: 550 W panel. Cable: 10 mm2 solar cable, red for +, black for -.String 1P1-+String endsDC isolator + DC SPDswitch OFF before touching wiresInverter / controller PV inputPV+ (red) PV- (black)Check with a multimeter BEFORE connecting:each string reads no more than 54 V (Voc) and thepolarity is right (+ on red). Never join strings withdifferent voltages. Panels give power whenever there is light.
Your battery bank: how to connect it
How to connect your batteries1 module(s) in SERIES per string (+ of one to - of the next): 1 x 24 V = 24 V.Bank: 24 V, 2.4 kWh. Module: 24 V 100 Ah. Cable: 10 mm2, crimped lugs.Use the same model and age for every module; make all links the same length; tighten to the datasheet torque.24 V-+String 132 ABattery fuse (on + lead, close to the battery)Battery isolator / DC breakerswitch OFF before any workInverter battery terminalsBAT+ (red) BAT- (black)Connect the last link only afterchecking voltage and polarity.
Complete system
Your whole system - Off-grid systemSolar panels (roof)1 panels = 0.55 kWp1 in series x 1 string(s)DC isolator + DC SPD150 V DC, >= 25 A, 2-pole, lockable10 mm2 PV cable (+ red, - black)MPPT charge controller30 A, 24 V battery, PV max 150...Off-grid inverter0.5 kW continuous, surge >= 0.2...Battery bank1 S x 1 P = 2.4 kWhFuse + battery isolator32 A NH/ANL/class-T DC fuse10 mm2 battery cablebattery -> inverterAC MCB + RCD 30 mA + AC SPDMCB 6 A, cable 2.5 mm2AC: L brown, N blue, PE green/yellowDistribution boardyour appliances (no NEA connection)Earth electrode16 mm2 to earth barbattery - earthed (book 109)Dashed green = earth wires (green/yellow insulation).
Earthing
How to earth your systemAll metal parts and the earth bar connect to ONE earth electrode. Use green/yellow cable only.Measure the earth resistance after installation and write it in the test record.Main earth bar (in DB)Panel frames + rails6 mm2 bondingInverter PE terminal2.5 mm2 PEDB / sockets PEexisting PE barBattery negativeper book 109 / makerEarth pitEarth rod (electrode)drive into moist soilMain earth conductor 16 mm2, about 10.0 m
Inverter terminals - what goes where
Inverter terminals - what goes wheredisplayOff-grid inverterBatteryBAT+BAT-AC OUT to loadsLNPEColours: DC + red, DC - black. AC: L (line) brown, N (neutral) blue, PE (earth) green/yellow.Check YOUR model's manual: terminal positions and labels vary between makes.Connect in this order: earth (PE) first, then battery, then AC, then PV last; switch on battery -> inverter -> PV.MPPT charge controllerPV+PV-BAT+BAT-Connect the controller to the battery FIRST,then the panels (most controllers need batteryvoltage to start).
Shopping list with "compulsory or optional in Nepal" (23 items)
ItemCompulsory or optional?SpecificationQty
Solar PV moduleCompulsory (safety)550 Wp mono/TOPCon, Voc 49.5 V, Vmp 41.6 V, Isc 14 A, efficiency ≥ 21 %, power warranty ≥ 80 % at 25 yr, IEC 61215/617301
Mounting structureCompulsory (safety)Hot-dip galvanised / aluminium tilt frame with anchor bolts, tilt as designed1 row(s) of up to 1
Mounting railsCompulsory (safety)Aluminium PV rail (2 per row of panels)3 m
End clamps / mid clampsCompulsory (safety)Matching panel frame thickness4 end / 0 mid
Roof feet / anchorsCompulsory (safety)Stainless fixings, sealed against leaks4
PV cable (red and black)Compulsory (safety)10 mm² solar cable EN 50618 (H1Z2Z2-K), UV resistant, 1500 V DC13 m red + same black
MC4 connector pairsCompulsory (law / NEA)Same brand as panel connectors (never mix brands)4
DC isolator (PV)Compulsory (safety)150 V DC, ≥ 25 A, 2-pole, lockable1
DC surge protection device (Type 2, PV)Strongly recommendedUcpv ≥ 150 V DC, In ≥ 20 kA1
MPPT charge controllerCompulsory (safety)30 A, 24 V battery, PV max 150 V, efficiency ≥ 95 %, battery-type setting for LiFePO4 (lithium)1
Off-grid inverterCompulsory (safety)0.5 kW continuous, surge ≥ 0.2 kW, 24 V DC input, pure sine 230 V 50 Hz1
BatteryCompulsory (safety)LiFePO4 24 V 100 Ah with BMS, ≥ 3000 cycles @ 80 % DoD, round-trip ≥ 85 %, warranty ≥ 5 yr, communication with inverter (CAN/RS485)1
Battery cable (red and black)Compulsory (safety)10 mm² flexible copper, crimped lugs4 m each colour
Battery fuse (DC, high breaking capacity)Compulsory (safety)32 A NH/ANL/class-T DC fuse1
Battery isolator / DC breakerCompulsory (safety)32 A, 24 V DC rated1
AC MCB (inverter output)Compulsory (safety)6 A, C-curve, 1-pole + N1
RCD / RCBOCompulsory (safety)30 mA, Type A (Type B if the inverter manual requires)1
AC surge protection device (Type 2)Strongly recommended275 V AC, In ≥ 20 kA1
AC cableCompulsory (safety)2.5 mm² copper (phase + neutral) + 2.5 mm² earth7 m
Earth electrodeCompulsory (safety)Copper-bonded rod ≥ 1.5 m (or copper plate earth pit per local practice), inspection pit1
Earth cable (green/yellow)Compulsory (safety)6 mm² frame bonding, 16 mm² to electrode, 2.5 mm² PE17 m total
Conduit / cable tray, glands, tiesCompulsory (safety)UV-resistant conduit outdoors; glands sized to cablesas required
Warning labelsCompulsory (safety)'Solar DC - live in daylight', isolator labels, dual-supply label at DB and meter1
Cables, fuses and breakers
CircuitFrom → ToLength (m)Design current (A)Protective device (A)Chosen (mm²)Voltage drop (%)
PV string cable (each string, + and −)Array → MPPT charge controller10.017.517.5101.39
Battery cable (+ and −)Battery bank → fuse/isolator → inverter1.522.932100.63
Controller → batteryCharge controller → battery busbar1.524.030100.66
Inverter AC outputInverter → distribution board5.02.262.50.08
PV frame bonding (earth)Each panel frame / rail → earth bar---6-
Main earthing conductorMain earth bar → earth electrode10.0--16-
Inverter / DB protective earth (PE)Inverter → DB earth bar5.0--2.5-

⬇ Full off-grid report (PDF) - parts explained, installation steps, tests

Why is 500 kW dearer per kWp than 1 MW? The transformer, 11 kV switchgear, metering and the 2 km line cost almost the same for both, so they weigh more on the smaller plant.

Sample reports

Download and see exactly what you will get.

Honest by design

Calculations are deterministic

Every number comes from a formula you can read in the report (Boxwell's Solar Electricity Handbook, Neill et al.'s Solar Farms, IEC standards) - never from AI guesses.

Sources and dates shown

Prices and rules carry their source and date. Assumptions are labelled. Data that could not be verified is said to be unverified.

Know the stop-points

The report tells you what NEA must approve, what is compulsory for safety, and when to get help with 230 V wiring.